top of page

INFRASTRUCTURE

Arrow Down

A Track record in Infrastructure 

DJ Civils delivers large-scale civil engineering and infrastructure solutions for critical transport and public sector projects. Our experience spans highways, public realm spaces, port infrastructure, and airside works, providing reliable groundwork built to specification and built to last.

DJI_0707_edited_edited_edited.jpg

Highways

We develop highway infrastructure, including new carriageways, junctions, and access roads for both public and private sector developments. Our services include sub-base formation, kerbing, drainage, ducting, and full road surfacing. With in-house traffic management and phased delivery planning, we ensure works are completed safely, on time, and in accordance with local authority standards.

​​

20230924_134056000_iOS.jpg

Public Realm

Our teams deliver public realm civil engineering across high streets, civic spaces, transport hubs, and mixed-use developments. We construct paved areas, install drainage, ducting, lighting bases, seating foundations, and hard landscaping features. Projects are delivered with careful attention to finish quality, accessibility, and durability in high-traffic, urban environments.

​​

Image by Alex Duffy

Ports

We support marine and port infrastructure with heavy-duty groundwork engineered for high-load environments. Our services include quay slab construction, drainage systems, ducting, reinforced structures, and HGV-accessible roads. With experience in coastal and logistics settings, we deliver infrastructure that supports long-term operational performance.​​

Image by Pascal Meier

Airports

Our airport civil engineering services include airside and landside groundwork, such as hardstandings, access roads, drainage, ducting, and service routes. We work under strict safety, environmental, and regulatory controls, coordinating closely with airport operations to minimise disruption. Our proven track record includes phased works in live aviation environments.

Construction Line
SSIP
Achilles
ISO
ISO
ISO
CHAS

Brentwood -S278 Highway Works

The construction of a new roundabout and realignment s of the existing highway to facilitate access to a new industrial unit complex.


DJC were responsible for all the permitting, stakeholder engagement and traffic management planning which was delivered by our sister company, Franklin Infrastructure.


DJC worked collaboratively with the local Highway Authority to shorten the works programme and minimise disruption and impact of the works on the local community.

Scope:

  • Earthworks

  • Drainage and service ducts

  • Construction of a new roundabout, highway and footways.

  • Installation of street lighting and highway signage

  • New road markings and high friction surfacing

Value:

  • £2.0m

​​Duration:

  • 26 weeks​

Sector:

  • Infrastructure

​Location:

  • Brentwood,

Essex

DJI_0704.JPG
bottom of page